Figure 6-6 Installing a supporting plate
Step 5 Install a partition plate. Press both sides of the V-shaped partition plate with hands to decrease
the angle to a proper degree, and clamp the clasps at the bottom into the nearby holes. (By
default, clamp the clasps into the two holes in the middle. In actual conditions, you can select
holes as required.)
Figure 6-7 Installing a partition plate
Step 6 Install adjacent cable troughs in the same way.
Step 7 Rotate the interconnecting wrench and clamp it into the clasps until the wrench is horizontal.
This operation interconnects the cable troughs.
Issue 04 (2017-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 (Optional) Installing Cable Troughs
118

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents