FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Align the upper and lower holes before tightening screws.
The enclosure frame side with anchor bolts should face the cabinet bottom.
Figure 3-40 Securing an enclosure frame
Step 5 Install the one bolt fastener, four cabinet connecting kits, and two front door mounting kits
removed in
Step 6 Install the front door on the enclosure frame.
Step 7 Install the LCD power cable. Connect the ground cable under the front door to the enclosure
frame according to the label on the enclosure frame.
Step 8 Cut the cable ties securing the LCD power cable to the cabinet, and ensure that the door can
be opened and closed smoothly.
----End
Issue 04 (2017-06-30)
Step 3
on the corresponding positions on the enclosure frame.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Hardware Installation Preparations