FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Figure 5-1 Installing a sealing plate
Step 2 Place a sealing plate.
When placing a sealing plate, keep the smooth plane facing the outside of the contained
aisle.
Keep the end with rivet nuts facing upward and the end with holes facing downward.
Ensure that the side of cabinets is on the same plane as the side of the sealing plates.
Step 3 (Optional) If the floor is uneven, add a 1.0 mm or 2.0 mm high spacer under the lower sealing
plate, as shown by (1) in Figure 5-1.
Step 4 Secure the sealing plate to the floor using ST4.8x25 tapping screws or DKBA44091028
plastic expansion bolts and gaskets, as shown by (2) in Figure 5-1.
The number of screws for securing the sealing plate must be same as the number of
corresponding holes in the lower end of the plate.
Issue 04 (2017-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Installing the Contained Aisles