3.8.2 Installing Adjustable Bases

3.8.2.1 Installing a Cabinet Base

3.8.2.1.1 Assembling a Base

Procedure
Step 1 Adjust the base height.
1.
2.
Issue 04 (2017-06-30)
Measure the distance (H) between the concrete floor and the upper surface of the ESD
floor using a ruler and record the value of H.
Figure 3-43 Measuring the ESD floor height
Adjust the base height to H and tighten the height locking bolts on the feet.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Hardware Installation Preparations
59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents