7.5 Installing an ECC800

Procedure
Step 1 Determine the mounting holes for an ECC800 based on the network cabinet device layout,
adjust the guide rails, and install floating nuts.
Step 2 Place the ECC800 in the network cabinet with caution.
Step 3 Secure the ECC800 in the network cabinet by tightening the M6 screws on the left and right
mounting ears clockwise.
Figure 7-10 Installing an ECC800
Step 4 (Optional) Remove the ECC800 main control module and install the SIM card in the correct
slot of the main control module as required.
1.
2.
Issue 04 (2017-06-30)
Loosen the captive screws on both sides of the ECC800 main control module, pull the
handles on both sides of the main control module, and take out the main control module.
Figure 7-11 Removing an ECC800 main control module
Install the SIM card in the correct slot on the left side of the ECC800 main control
module.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Installing Monitoring Devices
129

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents