Table 7-1 Names and BOM numbers of monitoring actuators and converters
Name
AC actuator
Access
actuator
WiFi
converter
Skylight
actuator
Procedure
Step 1 Remove the fastener, remove M4 screws, and take off the rear plate.
Figure 7-27 Removing the rear plate from the upper frame mounting kit
Step 2 Install the WiFi converter onto the guide rail. Determine the installation position for the WiFi
converter based on the label on the upper frame mounting kit. Align the upper slot on the rear
mounting kit of the WiFi converter with the upper part of the guide rail and then press the
lower part of the converter to clamp the lower slot of the converter to the guide rail. Shake the
WiFi converter in different directions to check that it is securely installed.
Issue 04 (2017-06-30)
BOM
Description
Number
52271876
Install it at the upper frame mounting kit for the PDC in
the smart module.
52271874
Install it at the upper frame mounting kit for the PDC or
network cabinet in the smart module.
50100888
Install it at the upper frame mounting kit for the PDC in
the smart module. Use it with the WiFi antenna (BOM
number: 27012015).
52271875
If one skylight actuator is configured, install it in the
upper frame mounting kit for the network cabinet in the
smart module. If two skylight actuators are configured,
install them in the upper frame mounting kits for the
front and rear end doors respectively.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Installing Monitoring Devices
140

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents