Layered installation is used as an example to illustrate the installation method.
Procedure
Step 1 Use screws to secure the cable tray supports at the coated positions on the cable trays.
Figure A-28 Assembling cable trays
Issue 04 (2017-06-30)
Figure A-27 Layered installation
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
A Appendix
228