FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Figure A-42 Routing half-sized PDU2000 cables
Step 3 Remove the rodent-proof mesh from the top of the cabinet, use diagonal pliers to cut openings
that allow cables to run through, and take out the PDU2000 cables through the openings, as
shown by (1), (2), and (3) in Figure A-43.
Figure A-43 Taking out PDU2000 cables
Issue 04 (2017-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
A Appendix