FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Name, Specifications, and Appearance
Adjustable wrench
(6")
Torque wrench (28
mm)
Electric screwdriver
Laser locator
Polyvinyl chloride
(PVC) insulation
tape
Issue 04 (2017-06-30)
Socket wrench
M4/M6/M8/M12
Solid wrench
(12#/13#/18#)
Hand drill (Φ3,
Φ3.7, Φ4, Φ4.5, Φ5,
Φ6, Φ10, and Φ12
drill bits)
Utility knife
Needle-nose pliers
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
1 Installation Preparations
Hex key
Cotton cloth
Hammer drill (Φ16
drill bit)
Electrician's knife
Diagonal pliers
Box-end wrench
(M6, M8, and M12)
Labels
Heat gun
Impact tool
RJ45 crimping tool