FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Figure 3-56 600 mm wide adjustable base
(1) Used for a PDC in a cold aisle
containment or an air conditioner in a hot
aisle containment
When deploying the base, place the side marked FRONT facing the aisle containment.
Procedure
Step 1 (Optional) Adjust the adjustable feet of the base.
1.
Issue 04 (2017-06-30)
Move the adjustable feet of the air conditioner base to the cabinet front (close to the front
door of the cabinet).
Move the adjustable feet of the PDC base to the cabinet rear (close to the rear door of the
cabinet).
Remove the four M6 screws from adjustable feet and set them aside.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Hardware Installation Preparations
(2) Used for an air conditioner in a cold
aisle containment or a PDC in a hot aisle
containment