Figure A-6 Column occupying part of a cabinet place (A < 800 mm and B ≥ 400 mm)
Issue 04 (2017-06-30)
Cabinet places on the column side are left blank and sealed by sealing plates. Directions of the
concave sides of the sealing plates are shown in Figure A-6.
Install cable trays over the cabinets on both sides of the blank cabinet place for routing
strong-current and weak-current cables.
Install an adjustable skylight over the aisle containment. The area to be covered by the adjustable
skylight is shown in Figure A-6.