FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Figure 3-37 Upper sealing plates of an enclosure frame
Figure 3-38 Installing the upper sealing plates of an enclosure frame
Step 3 Remove one bolt fastener, four cabinet connecting kits, and two front door mounting kits.
Put away the removed one bolt fastener, four cabinet connecting kits, and two front door
mounting kits for subsequent installation.