Huawei FusionModule2000 Installation Manual page 63

Smart modular data center, 2000 mm high cabinets, single-row aisle containment, 380 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Figure 3-37 Upper sealing plates of an enclosure frame
Figure 3-38 Installing the upper sealing plates of an enclosure frame
Step 3 Remove one bolt fastener, four cabinet connecting kits, and two front door mounting kits.
Put away the removed one bolt fastener, four cabinet connecting kits, and two front door
mounting kits for subsequent installation.
Issue 04 (2017-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Hardware Installation Preparations
54

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents