Huawei FusionModule2000 Installation Manual page 126

Smart modular data center, 2000 mm high cabinets, single-row aisle containment, 380 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Figure 6-4 Rotating the vertical plate by 90 degrees
Step 3 Install the other vertical plate into the mounting hole in the second row counting from the
front door to the rear door in the same way. Install one M5x10 tapping screw inside each of
the two vertical plates to ensure equipotential bonding with the cabinet.
Figure 6-5 Installing the other vertical plate
Step 4 Press a supporting plate along the two vertical plates down to the place between the four
clasps and the cable bridge. Ensure that the supporting plate is fully clamped into the clasps.
When installing the supporting plate, do not remove the grommet strip on the U-shaped trough.
Issue 04 (2017-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 (Optional) Installing Cable Troughs
117

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents