FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Figure 10-21 Base ground points
(1) Base ground points
Figure 10-22 Connecting the ground cable between the base and cabinet
Issue 04 (2017-06-30)
Connect one end of the base ground cable to any of the base ground points shown by (1)
in Figure 10-21, and connect the other end to the general ground copper bar of the
equipment room.
Connect one end of the base ground cable to any of the base ground points shown by (1)
in Figure 10-21, and connect the other end to the ground copper bar at the rear door
bottom inside the cabinet, as shown in Figure 10-22. Then connect the module ground
cables by following instructions in 10.8.1 Grounding Cabinets.