Huawei FusionModule2000 Installation Manual page 261

Smart modular data center, 2000 mm high cabinets, single-row aisle containment, 380 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
No.
8
Electric Installation Checklist
No.
1
2
3
4
5
6
7
8
9
10
11
Customer signature:
Check date:
Issue 04 (2017-06-30)
Check Item
There is no unnecessary adhesive tape or cable tie on
cables.
Check Item
All ground cables are copper cables with diameters
meeting the requirements. No switch or fuse is
installed at the middle of a ground cable, and no
short-circuit occurs.
Ground cables, AC input power cables, and
internal cables are connected in accordance with
the circuit diagram and screws are secured. No
short-circuit occurs on power inputs or outputs.
Power cables and ground cables are not coiled and
extra parts are cut off.
Lugs for power cables and protective ground
cables are soldered or crimped securely.
Power cables and ground cables are routed and
bundled separately from other cables.
Batteries are free from damage, cracks, and bulges.
Batteries are neat and do not leak electrolyte.
Wiring terminals of batteries are free from
damage, break, and acid leakage.
Battery safety valves are intact, without leakages.
Battery cables are correctly connected, and the
terminal voltages of battery strings are normal.
DIP switches on devices are correctly set.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
C Installation Verification
Check Result
□ Compliant □
Incompliant
Check Result
□ Compliant □ Incompliant
□ Compliant □ Incompliant
□ Compliant □ Incompliant
□ Compliant □ Incompliant
□ Compliant □ Incompliant
□ Compliant □ Incompliant
□ Compliant □ Incompliant
□ Compliant □ Incompliant
□ Compliant □ Incompliant
□ Compliant □ Incompliant
□ Compliant □ Incompliant
252

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents