Huawei FusionModule2000 Installation Manual page 36

Smart modular data center, 2000 mm high cabinets, single-row aisle containment, 380 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Figure 3-8 Position of the water tank
(1) Water pan
Figure 3-9 Positions of high and low floats
(1) High float
Procedure
Step 1 Loosen the two butterfly nuts from the high and low floats in the water tank, and remove the
transport fasteners for the floats.
Step 2 Secure the butterfly nuts.
Issue 04 (2017-06-30)
(2) Water tank
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Hardware Installation Preparations
(3) High and low floats
(2) Low float
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents