Step 2 Deploy the air conditioner base on the concrete floor based on the site engineering layout
diagram.
----End
Issue 04 (2017-06-30)
Figure 3-53 Removing adjustable feet
Move the adjustable feet to the mounting holes on the base according to the depth of the
air conditioner.
Secure the adjustable feet using the four M6 screws removed before.