FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
2.
3.
Step 2 Deploy the 600 mm wide adjustable base on the concrete floor based on the site engineering
layout diagram.
Step 3 Deploy other 600 mm wide adjustable bases in the same way.
----End
Issue 04 (2017-06-30)
Figure 3-57 Removing adjustable feet
Move the adjustable feet to the mounting holes on the base according to the depth of the
cabinet.
Secure the adjustable feet using the four M6 screws removed before.
Figure 3-58 Securing adjustable feet
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Hardware Installation Preparations
69