FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Device Name
Precision PDC

10.10 Connecting Cables for the Cooling System

To connect cables to cooling devices, see the documents delivered with the devices. Table
10-4 lists the reference documents.
Table 10-4 Reference documents for the cooling system
Device Name
NetCol5000-A 25 kW air
cooled in-row precision
air conditioner
NetCol5000-A 35 kW air
cooled in-row precision
air conditioner
NOTE
NetCol500 outdoor unit

10.11 Connecting Cables for the Management System

See Smart Module Management System Wiring Diagram (The document is delivered with the
device, or you can click Download.).
Issue 04 (2017-06-30)
When the pipes of the 35
kW air cooled in-row
precision air conditioner
are routed from the bottom,
the outdoor unit power
cable is recommended to
be routed as follows: along
the copper pipe to the
indoor unit, then from the
indoor unit interior to the
top, and finally to the PDC
through a cable trough.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Reference
PDU8000 Modular Precision PDC Quick Guide (1100 mm
Deep)
Click Download.
Reference
NetCol5000-A 25 kW Air Cooled In-row Precision Air
Conditioner Quick Guide (300 mm Wide)
The document is delivered with the device, or you can click
Download.
NetCol5000-A 25 kW&35 kW Air Cooled In-row Precision Air
Conditioner Quick Guide (600 mm Wide)
The document is delivered with the device, or you can click
Download.
NetCol500 Variable Speed Outdoor Unit User Manual
Click Download.
10 Cable Routing
202

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents