V100R003C00
Commissioning Guide
Issue
02
Date
2017-01-10
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei FusionModule1000B V100R003C00

  • Page 1 FusionModule1000B Water-Cooled IT Solution V100R003C00 Commissioning Guide Issue Date 2017-01-10 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury. Indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate injury. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 4 Fire extinguishing device commissioning (standard): Optimized the content.  Fire extinguishing device commissioning (CE): Optimized the content. Issue 01 (2016-09-25) This issue is the first official release. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 5: Table Of Contents

    6 Power-On Commissioning ......................36 6.1 General Power-On Commissioning Process ....................... 36 6.2 Power-On Commissioning ............................37 6.3 Normal Power-On Checking for Components ......................38 7 System Commissioning ......................44 Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 6 9.5.1 Commissioning the Extinguishant Control Panel (CE) ..................100 9.5.2 Commissioning the Emergency Light (CE) ......................101 9.6 Commissioning the VESDA ............................. 102 10 Acronyms and Abbreviations ....................104 Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 7: Precautions For Power-On Commissioning

    Operations marked as optional in chapters, sections, or procedures can be performed depending on the actual situation.  Huawei assumes no liability for any loss caused by unauthorized changes to the initial configuration parameters. Issue 02 (2017-01-10) Huawei Proprietary and Confidential...
  • Page 8: Basic Rules For Power-On Commissioning

    Power on circuit A before powering on circuit B.  Power on the general input power PDC, power equipment, and loads in turn.  Power equipment power-on sequence: lights, fire extinguishing systems, and air conditioners Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 9: General Power-On Commissioning Process

    FusionModule1000B Water-Cooled IT Solution Commissioning Guide 3 General power-on commissioning process General power-on commissioning process Figure 3-1 General power-on commissioning process Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 10: Preparations For Power-On Commissioning

    Table 4-1 Tools Tools Phillips screwdriver Flat-head screwdriver Utility knife Multimeter Electroprobe Network cable tester Cable tie Insulation tape Marker Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 11: Obtaining Technical Documents

    Mobile lights Hand-held thermometer Heat shrink tubing Phase-sequence meter Clamp meter Insulation megohmmeter 4.2 Obtaining Technical Documents Table 4-2 lists the technical documents required for FusionModule1000 power-on commissioning. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 12 Conditioner User Manual chilled water in-row (Simple Configuration) precision air conditioners. UPS2000-G-(6 kVA–20 kVA) Describes how to Download this document User Manual commission the from http://e.huawei.com. UPS2000-G. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 13: Commissioning Personnel Skill Requirements

    FusionModule1000 With fire protection engineer qualifications Lighting and Familiar with the overall configurations and layout of the structural systems FusionModule1000 Experienced in data center maintenance Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 14: Preparing For The Power Supply And Distribution System Power-On Commissioning

    Step 4 Understand the initial configurations of the power supply and distribution system by referring to the power supply and distribution component initial configuration table. ----End Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 15: Preparing For The Cooling System Power-On Commissioning

    If the local lowest temperature recorded is above 0° C and municipal water quality meets requirements, it is recommended that municipal water be used as the secondary refrigerant. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 16 < 200 mg/L Acid consumption < 100 mg/L (with pH 4.8) Total hardness < 200 mg/L Calcium hardness < 150 mg/L < 50 mg/L < 1.0 mg/L Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 17 After the Cooling Container is powered on, the auxiliary water refill devices are connected to the ATS in the Cooling Container PDB to obtain power. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 18 Glycol solution is toxic. Never drink it and avoid contact with your skin, eyes, mouth, or nose. Table 4-8 Glycol concentration requirements at lowest temperatures Local Lowest Temperature Glycol Solution Power Density Recorded (° C) Concentration Derating Coefficient 95.1% 92.9% 90.5% 88.9% Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 19: Configuring Cooling Components

    Table 4-9 to understand the valves. Table 4-9 Valve description Name Appearance Common Position Wafer External pipes, Cooling Container type butterfly valve Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 20 Two-way LCU water pipe connection screwed (Power Container and end brass Equipment Container) ball valve Safety Cooling Container valve Automati Cooling Container c exhaust valve Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 21 Step 9 Verify that the condensate drainpipe is not blocked. Step 10 Reinstall raised floors in the Power Container and Equipment Container. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 22: Verifying The Setting Of The Automatic Water Refill Valve

    Procedure Step 1 Close the service valve for the automatic water refill valve. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 23 Step 3 Loosen the lock nut, and rotate the adjustment bolt counterclockwise to fully loosen it, as shown in Figure 4-3. Slowly rotate the adjustment bolt clockwise until the pressure reads 0.15 MPa. Then tighten the lock nut. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 24: Switching Valves For Filling Secondary Refrigerant

    Valves in the cooling system can work in three states: secondary refrigerant filling, running, and maintenance and service. Preparations Tools: ESD floor suction plate Documents: pipe system diagram, pipe system valve control relationship table Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 25: Filling Secondary Refrigerant

    Step 1 Start the auxiliary water refill devices to fill secondary refrigerant to the system. Step 2 Open the automatic exhaust valves on the top of the chilled water tank. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 26 Step 4 After air is completely expelled, fill secondary refrigerant to the cooling system. When the system pressure reaches 0.15 MPa, shut down the auxiliary water refill devices. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 27: Expelling Air From The Cooling System

    For the diagrams and tables, see the initial configuration parameter manual for the solution in use. Procedure Step 1 Open the overhaul valve for an expansion tank, as shown in Figure 4-5. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 28 Step 2 Open the automatic exhaust valve for the expansion tank and turn the nut counterclockwise, as shown in Figure 4-6. Figure 4-6 Opening the automatic exhaust valve for an expansion tank Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 29: Expelling Air From The Lcu

    Step 1 Open the rear sealing panel of the LCU using a key. Step 2 Slowly open the LCU manual exhaust valve to expel air from the LCU. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 30: Expelling Air From Chillers

    If glycol solution is used as the secondary refrigerant, wear rubber gloves for the operation and prepare a water container to collect the secondary refrigerant flowing from the cooling system. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 31 Step 3 Put one end of the exhaust hose into a water container and connect the other end with a needle valve to the manual pump exhaust valve. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 32 Figure 4-10 Manual coil exhaust valves Step 6 When water flows continuously out of the exhaust hose, remove the exhaust hose from the manual coil exhaust valve. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 33 If glycol solution is used as the secondary refrigerant, dispose of the glycol solution collected during air expelling in accordance with local laws. Step 9 (Optional) Shut down the chiller water pumps. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 34: Switching Valves To The Operating State

    Step 3 Switch valves inside the Power and Equipment Containers to the operating state. For details, see the pipe system diagram and pipe system valve control relationship table. Step 4 Reinstall raised floors in the Power Container and Equipment Container. ----End Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 35: Preparing For The Management System Power-On Commissioning

    4.7 Preparing for the Fire Extinguishing System Power-On Commissioning Prerequisites The FusionModule1000 has been installed. Preparations Tools: none Documents: fire extinguishing device layout diagram, fire extinguishing system conceptual diagram Skill requirement: fire extinguishing engineer Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 36: Optional) Auxiliary Heating For Extra Low Temperatures

    Recommend Quantit Deployment Prerequisite ed Power Equipment 2 kW 3 PCS Distributed evenly in the The ambient Container cold aisle. temperature can be lower than 5° C. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 37 When the auxiliary heater is heating the container, ensure that all container doors are closed to avoid heat loss and improve the temperature rising speed. ----End Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 38: Items To Be Checked Before Power-On

    Document required: initial configuration parameter manual Skill requirement: power distribution system engineer Items to be Checked Before Power-On Table 5-1 describes the items to be checked before the FusionModule1000 is powered on. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 39 All PDC, PDB, and PDU  Check the circuit breaker circuit breakers are in the status. OFF state, and all SPD circuit breakers are in the ON state. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 40 0.15 MPa. water refill requirement. valve Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 41 Light Device Check the lighting device Components are installed at installation installation and cable connections. the correct positions. syste and cable  Cables are correctly connections connected. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 42: Power-On Commissioning

    This section describes the general power-on commissioning process for the water-cooled prefabricated modular data center IT solution. 2N Power Supply and Distribution System Figure 6-1 Power-on commissioning process for the 2N power supply and distribution system Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 43: Power-On Commissioning

    6.2 Power-On Commissioning Prerequisites  You have prepared for the power-on commissioning.  You have verified all the specifications for the power-on.  You have put on protective articles. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 44: Normal Power-On Checking For Components

    For details about initial configuration parameters in the FusionModule1000, see the initial configuration parameter manual for the solution in use. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 45  Surge The SPD circuit breaker is switched on. protective  The SPD indication window is green. device  The SPD signal terminals are normally (SPD) closed. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 46 The temperature settings and control precision are appropriate. settings control precision Compone All components are installed in the correct nt layout positions. Settings Other functions are properly set. of other functions Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 47 The power indicator is on. sensor Polymer Displays the temperature and humidity values. temperatu re and humidity (T/H) sensor Intelligent The RUN and LINK indicators are on. battery monitorin g module Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 48 Check the The alarm and fault indicators are off. horn/strobe alarm and fault Gas release indicators indicator on the fire alarm Pressure control announciator panel. Electromagn etic valve Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 49 Horn strobe Warning signs indicator VESDA VESDA VESDA The VESDA power indicator is on, and there power box power-on is no alarm in the management system. commissi oning Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 50: System Commissioning

    Step 3 Remove the other power plug for the RH2288 server or switch off the corresponding rPDU input circuit breaker in the PDC. Step 4 Power on the RH2288 server 30s later. Check that the server works properly. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 51: Commissioning The Logic Load Disconnection (Powering-Off) Of The Power Supply System Under Normal Temperature

    Step 4 Verify whether the systems run stably after power-on. The FusionModule1000 meets requirements if its components are intact and systems are normal after powered off, and systems run stably after power-on. ----End Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 52: Commissioning The Cooling System

    The FusionModule1000 is powered on, commissioned, and working properly. During the commissioning, if any alarm is raised, clear the alarm before continuing the commissioning. Preparations Tool: network cable tester Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 53: Commissioning The Fire Extinguishing System (Standard)

    Step 4 Check that the views and videos in the management system are consistent with the running status of the data center. For details, see NetEco Commissioning Guide and NetEco Administrator Guide. If any inconsistency is found, contact Huawei technical support. ----End 7.4 Commissioning the Fire Extinguishing System...
  • Page 54 Step 4 Press KEY ON/OFF, QUERY TIME, and MANUAl/AUTO in turn to set the fire alarm control panel to the automatic mode. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 55 The fire alarm control panel reports a single fire alarm and the fire alarm sounder rings.  Do not clear the alarm and proceed to the alarm simulation for the heat detector. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 56 The fire alarm control panel reports another fire alarm, the fire alarm horn/strobe is triggered, and the gas release countdown starts (the countdown period is configurable and set to 30s by default). Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 57 Short-circuit the cables from the fire alarm control panel to the pressure announciator, as shown by (2) in Figure 7-8. The gas release indicator turns on at the same time. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 58 Figure 7-9.  Reset the START and STOP buttons after the commissioning (the buttons bounce up). Figure 7-9 Emergency start/abort switch Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 59 Verify that the fire alarm control panel has reported a zone fault, as shown in Figure 7-11. Zone 1 and 2 respectively indicate fault alarms for the smoke and heat detectors. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 60 7-13.  After the smoke detector or heat detector is reinstalled, the corresponding fault indicator turns off in about 3s. Figure 7-12 Smoke detector installation reference line Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 61 Step 13 Reconnect cables to the electromagnetic valve. Figure 7-14 Connecting cables to the electromagnetic valve Step 14 Remove the safety pin after verifying that the fire extinguishing system is working properly. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 62 Remove screws securing a safety pin. Figure 7-15 Removing screws Loosen the remaining three screws. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 63 7 System Commissioning Figure 7-16 Positions of the screws Remove the safety pin. Figure 7-17 Removing the safety pin Reinstall the removed screws and tighten all screws. ----End Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 64: Fire Extinguishing System Commissioning (Ce)

    Step 3 Switch on the input circuit breaker of the extinguishant control panel, and connect the battery cables to the extinguishant control panel. Step 4 Flip the key leftward to Auto & Manual, and set the extinguishant control panel to Auto & Manual. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 65 A smoke detector loop alarm is triggered, and the loop 1 fire alarm indicator on the extinguishant control panel is steady on. The fire alarm bell rings.  Do not clear the alarm and proceed to the alarm simulation for the smoke detector. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 66 The horn strobe is triggered, and the warning sign blinks. The Release Imminent indicator on the extinguishant panel turns on, and the release countdown starts. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 67 Figure 7-23 Enable Control position diagram Pull up the reset button on the pneumatic switch to short-circuit the cables within to simulate an extinguishant release. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 68 Press the red manual gas release button to trigger a release signal to the extinguishant control panel. The 30s release countdown starts. The warning sign indicator blinks, and the horn strobe is triggered. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 69 Reset the ejector of the electrical actuator. Press Processor Reset on the extinguishant control panel to reset the panel. Reinstall the electrical actuator on the container valve. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 70 Hold the heat detector, and rotate it counterclockwise to remove it from the base. The extinguishant control panel reports a loop 2 FAULT RELAY, and the loop 2 FAULT RELAY indicator turns on. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 71 Step 14 Flip the Enable Control key rightwards, reset the extinguishant control panel by pressing Reset on it, and then flip the Enable Control key leftwards to reset the key. ----End Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 72: Shutting Down And Powering Off

    During the power-off process, there is no fire or other exception, but the fire control panel displays a power failure alarm. Ignore the alarm. Step 5 Switch off the external power input circuit breaker of the FusionModule1000. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 73 FusionModule1000B Water-Cooled IT Solution Commissioning Guide 8 Shutting Down and Powering Off After power off, all circuit breakers should be in the OFF state. ----End Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 74: Commissioning Core Components

    (Optional) If an ATS is configured, go to Step (Optional) If an MCCB or MCB is configured, go to Step Step 2 (Optional) Commission the ATS. The ATS is an 8D ATS. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 75: Optional) Commissioning The 8D Ats

    Step 2 Verify 8D ATS configurations by referring to the 8D ATS initial configuration table and documents delivered with the 8D ATS. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 76: Optional) Commissioning The Pd510 Electricity Meter

    Step 1 Verify configurations of the PD510 electricity meter by referring to the delivered documents. During the PD510 electricity meter power-on commissioning, you are not allowed to modify the initial configurations unless you are authorized by onsite Huawei engineers. Step 2 Set a protection password for the PD510 electricity meter.
  • Page 77 The impulse constant refers to the electricity value impulse constant for each DO output impulse. The value is an integer between 1 and 6000. Constant 1 indicates 0.1 kWh (Kvarh) of electricity. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 78 Setting ron: relay n Set based on the n = 0-8 actual situation. Type: alarm mode Default Refer to the DO working type table provided Table 9-4. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 79 Line voltage low alarm. alarm Line voltage high alarm Forcibly clear alarms. The delay time and pulse width are still functional during forcible clearance. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 80: Optional) Commissioning The Mdu

    MDU. The MDU allows you to set PDC parameters, view the running status and alarms, and upgrade software. Figure 9-1 MDU front view (1) Alarm indicator Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 81 Port Description Remarks (1) MUS05A (2) FE Network port connecting to the management system when the SNMP protocol is used (3) CAN Connecting to the CAN bus Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 82 During the MDU power-on commissioning, you are not allowed to modify the MDU initial configurations unless you are authorized by onsite Huawei engineers. Step 3 Enter a user name and password to access the MDU, set the user name, password, time, and language, and check that the initial parameter settings are correct.
  • Page 83: Commissioning The Ups5000-E

    During the power-on commissioning, you are not allowed to switch on the bypass circuit breaker for the UPS5000-E.  During the power-on commissioning, you are not allowed to modify the UPS5000-E initial configurations if not authorized by Huawei onsite engineers.  For the setting method, see the UPS5000-E user manual. ...
  • Page 84: Optional) Commissioning The Ups2000-G

    During the UPS2000-G power-on commissioning, you are not allowed to modify the UPS2000-G initial configurations unless you are authorized by onsite Huawei engineers. Step 3 Enter the user name and password to enter the operation screen, and verify that initial parameter settings are consistent with the initial configuration table.
  • Page 85: Commissioning Cooling Components

    If an alarm is displayed, clear the alarm by following instructions in documents delivered with the chiller before continuing the commissioning. Step 3 Verify the initial configurations of the chiller by referring to the chiller initial configuration table. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 86: Commissioning 30 Kw Chilled Water Precision Air Conditioners

    9.2.2 Commissioning 30 kW Chilled Water Precision Air Conditioners Prerequisites The power-on commissioning for the upstream PDC of 30 kW chilled water precision air conditioners is completed. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 87 Before power-on, clear dust, dirt, and foreign matter from the cabinet; otherwise, the water pump may be blocked, resulting in drainage failure or serious equipment malfunction. Step 2 Verify initial configurations of the 30 kW chilled water precision air conditioner. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 88: Initial Dip Switch Configuration For T/H Sensors

    When powering on and commissioning the 30 kW chilled water precision air conditioner, you are not allowed to modify the initial configurations of the 30 kW chilled water precision air conditioner unless you are authorized by onsite Huawei engineers. ...
  • Page 89: Initial Dip Configuration For The Main Control Board

    Context You need to set the DIP switch on the main control board of a 30 kW chilled water precision air conditioner before starting the air conditioner. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 90: Teamwork Initial Configuration

    Disconnect the power supply before setting the DIP switch. ----End 9.2.2.3 Teamwork Initial Configuration Prerequisites You have powered on the 30 kW chilled water precision air conditioners. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 91 OFF indicates shutdown, and NA indicates offline. 01/02/03/04 Indicates the device address. 01 is the master unit and others are all slave units. If the master unit is offline, teamwork networking fails. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 92 Red background color indicates that an emergency alarm is color: red/bright generated, gray/dark gray as shown in Bright gray background color indicates that no emergency alarm is generated, as shown in Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 93 Rotation period, Rotation time, Forced rotation, Requirement control, and Cascade. However, a slave device only supports parameters like Teamwork unit no., Teamwork unit address, and Teamwork function. Figure 9-6 Teamwork setting screen 1 Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 94 Set this parameter to the number of number of conditioners in a group. The value is precision air conditioners in a group. units an integer ranging from 1 to 32. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 95 Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 96 Figure 9-9 Teamwork information screen 2  Master/Slave and Active/Standby indicate the information of the current unit. Other information is about the teamwork information of the group. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 97: Initial Configuration Of Temperature And Humidity

    You need to obtain permission before changing system settings. Only trained and qualified personnel can change settings excluding the control type and setpoint of the T/H sensor. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 98 EMS to start or shut down the precision air conditioner. Figure 9-11 System control screen Step 3 Tap Settings > System Settings > T/H Sensor on the home screen to enter the screen shown Figure 9-12. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 99: Optional) Commissioning Civil Air Conditioners

    For the diagrams, see the initial configuration parameter manual for the solution in use. Procedure Step 1 Switch on the input power circuit breakers for air conditioners in the upstream PDB to power on the air conditioners. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 100: Commissioning Monitoring Components

    Step 5 Push the emergency exit rod, and check whether the emergency exit door opens properly. Step 6 Verify that the management system generates a door open alarm. Step 7 Press the exit button and push open the container door. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 101: Optional) Registering A Fingerprint Scanner User

    Read Card, swipe the card, and tap OK. Step 6 Tap to select an access level, and tap OK. Step 7 Scan your fingerprint or enter a password based on the operation mode. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 102: Initial Configurations For The Management System

    Parameters for V600R001C01 and collector IP address Later Versions > Setting the ECC500 V6 Collector IP Address Adding devices iManager NetEco Device Commissioning Guide > Adding Devices Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 103: Commissioning Fire Extinguishing Devices (Standard)

    If the power indicator is on and other indicators are off, the power-on process succeeds. If a yellow fault indicator is on, rectify the fault before continuing follow-up operations. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 104 Press S12. The H11 indicator lights up, indicating that the time is being adjusted. The nixie tube displays the year in the format of ? ?. Press S10 to add the value, which ranges from 1 to 60. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 105: Commissioning The Emergency Lights (Standard)

    You can also turn off the emergency light by pressing and holding the TEST button for more than  If the result expected for each step appears, the emergency light is working properly. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 106: Commissioning Fire Extinguishing Devices (Ce)

    Step 3 Press Silence/Sound Alarm to start or abort the fire alarm bell. Step 4 Press Alarm/Fault Warning Silence to silence the fault noise generated by the extinguishant control panel. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 107: Commissioning The Emergency Light (Ce)

    Figure 9-16 Emergency light power plug Step 2 Remove the protective cover of the emergency light. Step 3 Remove the red pin of the emergency light. The emergency light turns on. Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 108: Commissioning The Vesda

    The red button is located at one side of the emergency light.  If the result expected for each step appears, the emergency light is working properly. ----End 9.6 Commissioning the VESDA Preparations Tools: smoke pistol Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 109 After the operation is complete, press the reset button to reset the VESDA. ----End Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 110: Acronyms And Abbreviations

    Power Usage Effectiveness rPDU rack power distribution unit uninterruptible power system Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 111 FusionModule1000B Water-Cooled IT Solution Commissioning Guide 10 Acronyms and Abbreviations video cloud node VESDA very early smoke detection apparatus Issue 02 (2017-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

Table of Contents