Huawei FusionModule2000 Installation Manual page 219

Smart modular data center, 2000 mm high cabinets, single-row aisle containment, 380 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
skylight
(7) Column in the
equipment room
If a column in the data center is irregular, ensure that the maximum cross section of the
column does not interfere with cabinets.
Figure A-5 Column in the aisle containment (A < 800 mm)
Issue 04 (2017-06-30)
skylight
Cabinet places on the column side are left blank and sealed by sealing plates. Directions of the
concave sides of the sealing plates are shown in Figure A-5.
Install cable trays over the cabinets on both sides of the blank cabinet place for routing
strong-current and weak-current cables.
Install an adjustable skylight over the aisle containment. The area to be covered by the adjustable
skylight is shown in Figure A-5.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
concave sides facing rightwards
A Appendix
210

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents