Step 4 Log in to the NetEco WebUI as an administrator.
Step 5 Choose System> Configuration Management > Data Center Planning. The Data Center
Planning window is displayed.
Step 6 Select the management domain to add a device. The management domain can be a modular,
rack, or equipment room.
Step 7 (Optional) If the management domain is a rack, click the management domain and choose
Design under
Step 8 In the lower-left corner of the page, click the Device tab. Click the drop-down list box in
Type and select Sensor.
Step 9 In this example, a Polymer temperature and humidity (T/H) sensor is added in the equipment
room of the root node. Select the device to be added and drag its icon to the management
domain.
Step 10 Set management attributes.
Issue 05 (2019-09-16)
If the port is set for the first time, you are prompted to set an authentication password.
On the Set Authentication Password tab page, set Authentication password and
Confirm authentication password and click Submit.
Enable security Authentication is set to Enable by default. If so, an authentication password must be
set. If Enable security Authentication is set to Disable, there is no need to set an authentication
password but this is risky.
If the port has been used, you will be prompted that the transparent transmission function
cannot be enabled and you need to select an idle port.
. The page for adding a device is displayed. Otherwise, skip this step.