User Manual
Figure 8-9 Example plan view without room monitoring
Figure 8-10 Example plan view with room monitoring
----End
Follow-up Procedure
To modify the smart module plan view, perform the following steps:
1.
2.
3.
4.

8.1.8 How Do I Set and Add Devices?

8.1.8.1 How to Set and Add an Integrated UPS Parameters?

Prerequisites
One end of the straight-through cable has been connected to the FE port on the integrated
UPS, and the other end has been connected to the POE port on the smart ETH gateway.
Issue 05 (2019-09-16)
Choose Home > Plan View.
Click Modify Device in Smart Module View. The Devices is displayed.
Drag registered devices (for example, the camera) to the appropriate positions in the
layout diagram and click Exit Edit Mode. The smart module plan view is updated.
When editing the smart module view, click
size of the view.
Copyright © Huawei Technologies Co., Ltd.
Zoom In or
Restore to adjust the