6.9 Remote Management

6.9.1 NetEco Management

6.9.1.1 Connecting the Communications Cable

Procedure
Step 1 Connect the communications cable to the WAN_1 port on the ECC800.
Figure 6-49 Connecting the communications cable
----End

6.9.1.2 Setting NetEco Parameters

When the smart module can be connected to the NetEco, perform the following steps to
configure parameters.
Procedure
Step 1 Apply for a fixed IP address to the equipment room network administrator.
Step 2 Set the IP address, subnet mask, and default gateway on the ECC800 WebUI.
Table 6-31 IP parameters
Path
System
Settings >
System
Parameters
> Monitor
IP >
WAN_1
Step 3 Click Submit.
Issue 05 (2019-09-16)
Parameter
Default
Value
IP
192.168.1.10
Subnet mask
255.255.255.
0
Default
192.168.1.1
gateway
Copyright © Huawei Technologies Co., Ltd.
Setting
Set this parameter based on the IP address
assigned by the network administrator.
Set this parameter based on the subnet mask
assigned by the network administrator.
Set this parameter based on the default
gateway address assigned by the network
administrator.