ABB RELION REX640 Technical Manual page 577

Hide thumbs Also See for RELION REX640:
Table of Contents

Advertisement

1MRS759142 C
REX640
Technical Manual
Vector group of the
Winding 1 type
transformer
ZNz0
ZNzn0
Zzn0
Zz2
ZNz2
ZNzn2
Zzn2
Zz4
ZNz4
ZNzn4
Zzn4
Zz6
ZNz6
ZNzn6
Zzn6
Zz8
ZNz8
ZNzn8
Zzn8
Zz10
ZNz10
ZNzn10
Zzn10
Zero-sequence component elimination
If Clock number is "Clk Num 2", "Clk Num 4", "Clk Num 8" or "Clk Num 10", the
vector group matching is always done on both, winding 1 and winding 2. The
combination results in the correct compensation. In this case the zero-sequence
component is always removed from both sides automatically. The Zro A elimination
parameter cannot change this.
If Clock number is "Clk Num 1", "Clk Num 5", "Clk Num 7" or "Clk Num 11", the
vector group matching is done on one side only. A possible zero-sequence component
of the phase currents at earth faults occurring outside the protection area is
automatically eliminated in the numerically implemented delta connection before the
differential current and the biasing current are calculated. This is why the vector group
matching is almost always made on the star connected side of the "Ynd" and "Dyn"
connected transformers.
If Clock number is "Clk Num 0" or "Clk Num 6", the zero-sequence component of the
phase currents is not eliminated automatically on either side. Therefore, the zero-
Winding 2 type
ZN
z
ZN
zn
Z
zn
Z
z
ZN
z
ZN
zn
Z
zn
Z
z
ZN
z
ZN
zn
Z
zn
Z
z
ZN
z
ZN
zn
Z
zn
Z
z
ZN
z
ZN
zn
Z
zn
Z
z
ZN
z
ZN
zn
Z
zn
Section 4
Protection functions
Phase shift
Zero sequence
current elimination
0
HV side
0
HV & LV side
0
LV side
2
Not needed
2
(Automatic)
2
(Automatic)
2
(Automatic)
4
Not needed
4
(Automatic)
4
(Automatic)
4
(Automatic)
6
Not needed
6
HV side
6
HV & LV side
6
LV side
8
Not needed
8
(Automatic)
8
(Automatic)
8
(Automatic)
10
Not needed
10
(Automatic)
10
(Automatic)
10
(Automatic)
571