6.1 NetEco Management

6.1.1 Connecting the Communications Cable

Procedure
Step 1 Connect the communications cable to the WAN_1 port on the ECC800.
Figure 6-1 Connecting the communications cable
----End

6.1.2 Setting NetEco Parameters

When the smart module can be connected to the NetEco, perform the following steps to
configure parameters.
Procedure
Step 1 Apply for a fixed IP address to the equipment room network administrator.
Step 2 Set the IP address, subnet mask, and default gateway on the ECC800 WebUI.
Table 6-1 IP parameters
Path
Issue 02 (2019-02-28)
6
Parameter
Default
Value
Copyright © Huawei Technologies Co., Ltd.

Remote Management

Setting
6 Remote Management
165

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents