Before You Prepare The System - GE AKTA avant User Manual

Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

5 Operation

5.1 Before you prepare the system

5.1

Before you prepare the system

Introduction
It is important to prepare the standard system in accordance with the settings in the
method to be run. Before preparing the system, check the settings in the Method Editor
and make sure that all accessories to be used are available.
Checklist
Make sure to prepare the system in accordance with the settings in the method to be
run. Make sure that you understand:
156
which valve ports to use for inlets and outlets
which column type to use
which column position to use
which buffers and samples to prepare
which sample application technique to use
that the pH electrode is connected and calibrated, if applicable
which cassettes with corresponding deep well plates and/or tubes to use in the
Fraction collector, if applicable
ÄKTA avant User Manual 29035184 AE

Advertisement

Table of Contents
loading

Table of Contents