GE AKTA avant User Manual page 337

Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

Step
4
5
6
7
8
ÄKTA avant User Manual 29035184 AE
Action
Cut the new tubing to the same length as the old tubing. Use a tubing cutter
to get a straight angle cut.
CAUTION
Cut injuries. The tubing cutter is very sharp and must
be handled with care to avoid injuries.
Note:
When replacing system tubing, use the original inner diameter and length to
ensure that the correct delay volumes are maintained. Inlet and outlet tubing
may be shortened if required.
Put the old labels on the new tubing.
Mount the connectors on the tubing.
For fingertight connectors:
Slide the connector onto the tubing.
For tubing connectors 1/8":
Slide the connector onto the tubing.
Slide the ferrule onto the tubing with the thick end towards the end of
the tubing.
Insert the tubing with connector into the port. Make sure to insert the tubing
all the way into the bottom of the port.
Tighten the connector fully. For areas difficult to access, use the fingertight
wrench included in the accessory kit.
7 Maintenance
7.8 Replacement procedures
7.8.1 Replace tubing and connectors
337

Advertisement

Table of Contents
loading

Table of Contents