4 Optional instrument modules
4.5 Extra Outlet valves
Note:
Connect tubing
The table below shows recommended connectors and tubing. For an illustration of
standard tubing labels see Tubing labels, on page 432.
Connection
between...
standard Outlet
valve and second
Outlet valve
second Outlet valve
and third Outlet
valve
1
118
The second or third Outlet valve can not be installed together with the second
Fraction collector F9-R.
Cut the spare piece of tubing delivered with the system to correct length.
Tubing
Tubing
label
1
10
For ÄKTA avant
25: PEEK, o.d.
1/16", i.d. 0.50 mm
For ÄKTA avant
1
11
150: PEEK, o.d.
1/16", i.d. 1 mm
V9-pH
Connector
For ÄKTA avant
25: Fingertight
connector, 1/16"
For ÄKTA avant
150: Fingertight
connector, 1/16"