GE AKTA avant User Manual page 142

Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

4 Optional instrument modules
4.11 Second UV monitor
System settings
If the UV monitor U9-L is placed between the UV monitor U9-M and the outlet valve , or
if the UV monitor U9-L is the peak fractionation controlling UV monitor the delay volume
has to be updated. See Check or set delay volumes, on page 153.
The UV absorption signal from the UV monitor U9-L is correlated to the real cell length.
If it is important to have absorption signals correlated to the nominal cell length a cali-
bration should be done.
142
ÄKTA avant User Manual 29035184 AE

Advertisement

Table of Contents
loading

Table of Contents