Transfer Oil Seal Removal and Installation
Removal
1) Lift up vehicle and drain transfer oil.
2) Remove front propeller shaft and/or rear propeller
shaft referring to "Propeller Shaft Removal and
Installation in Section 3D".
3) Remove front oil seal No.1 (1) and/or rear oil seal (2)
using flat end rod or the like.
Transfer: Motor-Shift Type (Transfer with Shift Actuator) 3C-56
Installation
S6JB0A3316003
1) Install new oil seal using special tool and plastic
hammer, and then apply grease to oil seal lip.
: Grease 99000–25010 (SUZUKI Super Grease
A)
Special tool
(A): 09913–70123
1
2
I5JB0A331031-01
2) Install front propeller shaft and/or rear propeller shaft
referring to "Propeller Shaft Removal and Installation
in Section 3D".
3) Fill transfer oil referring to "Transfer Oil Change:
Motor-Shift Type (Transfer with Shift Actuator)".
Transfer Switch Removal and Installation
Removal
Remove HVAC control module referring to "HVAC
Control Module Removal and Installation in Section 7A",
and then remove transfer switch (1) from center cluster
(2).
Installation
Reverse removal procedure.
1
(A)
(A)
I5JB0A331032-01
S6JB0A3316004
2
I5JB0A331003-02