P/S Pump Removal And Installation (F9Q Engine Model) - Suzuki Grand Vitara 2011 Manual

Hide thumbs Also See for Grand Vitara 2011:
Table of Contents

Advertisement

5) Disconnect pressure switch lead wire at switch
terminal.
6) Remove water pump and generator drive belt
referring to "Water Pump and Generator Drive Belt
Removal and Installation (For J20 Engine): For
Petrol Engine Model in Section 1J".
7) Remove P/S pump mounting bolts (1) and then
remove P/S pump.
1
1
NOTE
Plug each port of removed pump to prevent
dust or any other foreign matter from
entering.
Installation
Reverse removal procedure, and then nothing the
following instructions.
NOTE
Fill specified power steering fluid after
installation and bleed air without failure
referring to "P/S System Air Bleeding
Procedure".
Tightening torque
P/S pump mounting bolt: 25 N·m (2.5 kgf-m, 18.0 lb-
ft)
High pressure pipe union bolt: 60 N·m (6.0 kgf-m,
43.5 lb-ft)
P/S Pump Removal and Installation (F9Q Engine
Model)
Removal
CAUTION
!
Never disassemble P/S pump for diesel
engine model. Disassembly will spoil its
original performance. If faulty condition is
found, replace it with new one.
NOTE
Be sure to clean each joint of suction and
discharge sides thoroughly before removal.
1) Disconnect negative (–) cable at battery.
2) Remove generator referring to "Generator
Dismounting and Remounting: For Diesel Engine
Model in Section 1J".
3) Take out P/S fluid in reservoir with syringe or such.
4) Disconnect high pressure pipe and suction hose
from P/S pump.
NOTE
As fluid flows out of disconnected joints, put
a receptacle under joints or a plug to pipe.
5) Remove P/S pump mounting bolts (1).
6) Remove radiator inlet pipe No.1 bracket (3), and
then remove P/S pump (2).
I5JB0A630028-03
4
4. P/S pump bracket
NOTE
Plug each port of removed pump to prevent
dust or any other foreign matter from
entering.
Installation
Reverse removal procedure, and then noting the
following instructions.
NOTE
Fill specified power steering fluid after
installation and bleed air without failure.
(Refer to "P/S System Air Bleeding
Procedure")
Tightening torque
S6JB0A6306028
P/S pump mounting bolt: 25 N·m (2.5 kgf-m, 18.0 lb-
ft)
P/S pump high pressure pipe union bolt: 60 N·m (
6.0 kgf-m, 43.0 lb-ft)
Power Assisted Steering System:
2
1
6C-22
3
I5JB0B630007-01

Advertisement

Table of Contents
loading

Table of Contents