Verifying The Working Of The System Setup - Honeywell CIU 888 Configuration Manual

Hide thumbs Also See for CIU 888:
Table of Contents

Advertisement

FIGURE 4-12
FIGURE 4-13
NOTE: The ENTIS client certificate is valid for a period of 1 year after which a new
NOTE: If steps a, b, and c are redundant, they must be performed on both CIUA and
Part No.: 4417584_Rev12
Commissioning of a Standalone System Setup
Mange certificate: OPCUA CA Signed certificate.
c) Select the certificate and move it to the Approved Certificate
section.(see FIGURE 4-13)
Mange certificate: OPCUA CA Signed certificate.
d) Click on Close and when prompted for a restart, click on
Yes.Once the CIU restarts, ENTIS will communicate with the CIU
securely over OPC.
certificate will be generated. The new certificate must be approved in a similar
way.
CIUB.

4.10 Verifying the working of the system setup

The last step in the commissioning procedure is verifying if the CIU 888
system setup is working properly.
Configuration Manual
CIU 888
4 - 16