CHAPTER
4
This section describes the Vertex M system startup sequence.
4.1 Initial Startup
Use this section to turn on the Vertex M system and to configure the analyzer modules for
specific gas locations. There are six parts to this startup procedure:
Verify Installation
l
Power Up
l
Start Program
l
Configuration Utility
l
Load Tape
l
Leak Checking Sample Lines
l
Verify Flow Rates and Supply Vacuum
l
4.1.1 Factory Configuration
Honeywell loads all software on the DAq at the factory. The Universal Chemcassette™ Analyzers
are configured for the mineral acid family of gases and the Pyrolyzer Analyzers for NF
point for the target gases needs to be configured at the facility.
4.2 Getting Started
Before startup and configuration, gather the following information:
The location to which each point is connected
l
Target gas at each location
l
Alarm levels
l
Relay configuration
l
Vertex M
STARTUP
47
. Each
3
User Manual