4.10 Reconfigure

The modular design of the Vertex M allows limited reconfiguration. All wiring and tubing is in
place behind unpopulated slots. To add modules:
1. Remove filler panel.
2. Install new analyzer. See "Replacing an Analyzer" on page  125 for more information.
3. Configure new analyzer. See "Configuration Utility" on page  51 for more information.
4. Load tape. See "Load Tape" on page  73 for more information.
5. Leak check sample lines. See "Leak Checking Sample Lines" on the previous page for more
information.
6. Verify flow rates. See "Verify Flow Rates and Supply Vacuum" on page  73 for more
information.
Note: Any analyzers which are physically installed but not included in the configuration should
be de-energized.

4.11 Moving to a New Site

Before moving the Vertex M to a new site, use the following procedures to prevent loss of data
or damage to the monitor.
1. Remove all Chemcassette™ tapes and store as required by local policies.
2. Exit the Vertex M program. Touch Project and then Stop Project.
3. Back up data and configuration files. See "File Maintenance" on page  136 for more
information.
4. Open the front door and set all power switches to "Off".
5. Disconnect electrical supply at the source and then disconnect from the power terminal in
the side of the cabinet.
6. Disconnect sample lines and cap lines as required by local policies also cap Vertex M inlet
points.
7. Disconnect exhaust line and cap line as required by local policies.
8. Disconnect alarm relays.
Hazardous voltages may exist at the Alarm Contacts in this unit with the power switch
turned off. Insure power is disconnected at the source prior to servicing alarm
contacts.
Vertex M
WARNING
76
User Manual

Advertisement

Table of Contents
loading

Table of Contents