Cisco ONS 15454 Series Procedure Manual page 96

Dwdm
Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

Required Tools and Equipment (ETSI)
Step 5
Return to your originating procedure (NTP).
DLP-G677 Inspect the ONS 15454 Shelf Assembly
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Step 1
Open the shelf using the pinned hex key. For more information, see the
Compartment (Door)" task on page
Step 2
Verify the following:
Step 3
If the pins are bent or broken, or the frame is bent, call your Cisco sales engineer for a replacement.
Step 4
Close the front door before installing.
Return to your originating procedure (NTP).
Step 5
NTP-G306 Install the ONS 15454 Shelf Assembly
Purpose
Tools/Equipment
Prerequisite Procedures
Cisco ONS 15454 DWDM Procedure Guide, Release 9.2
1-8
This task verifies that all parts of the shelf assembly are in good condition.
Pinned hex (Allen) key for front door
DLP-G676 Unpack and Verify the ONS 15454 Shelf Assembly, page 1-7
Required
Onsite
None
The pins are not bent or broken.
The frame is not bent.
This procedure reverses the mounting bracket and mounts shelf assemblies
in a rack.
#2 Phillips Dynamometric screwdriver
Medium slot-head screwdriver
Small slot-head screwdriver
Pinned hex key
ETSI only:
ANSI only:
NTP-G305 Unpack and Inspect the ONS 15454 Shelf Assembly, page 1-7
Chapter 1
1-23.
Two M6 x 20 socket set screws
Eight M6 x 20 pan-head Phillips mounting screws
Two #12-24 x 3/4 set screws (48-1003-XX)
Eight #12-24 x 3/4 pan-head Phillips mounting screws (48-1004-XX,
48-1007-XX)
Install the Cisco ONS 15454 Shelf Assembly
"DLP-G9 Open the Front Cabinet
78-19286-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ons 15454Ons 15454 m2Ons 15454 m6

Table of Contents