Cisco ONS 15454 Series Procedure Manual page 124

Dwdm
Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

Required Tools and Equipment (ETSI)
Note
If the system loses power or if both TCC2/TCC2P/TCC3 cards are reset, you must reset the
ONS 15454 ETSI clock. After powering down, the date defaults to January 1, 1970, 00:04:15. To reset
the clock, see the
page
Step 1
Verify that the MIC-A/P FMEC is installed in Slot 23 and the MIC-C/T/P FMEC is installed in Slot 24 of the
EFCA.
Attach the connector on the end of the power cable to the power FMEC.
Step 2
Step 3
Tighten the screws of the connector on the power cable.
Step 4
Connect the power cable to the fuse panel or power source. Use the pin connections in
green-yellow cable is included in the power cable, it must be connected to ground.
Table 1-1
Pin
A1
A2
A3
Step 5
Return to your originating procedure (NTP).
Cisco ONS 15454 DWDM Procedure Guide, Release 9.2
1-36
"NTP-G24 Set Up Name, Date, Time, and Contact Information" procedure on
5-15.
Pin Connection of the Power FMECs
Function
Battery return
–48 V battery
Ground
Chapter 1
Install the Cisco ONS 15454 Shelf Assembly
Cable Color
Black
Red
Green with yellow stripes
Table
1-1. If the
78-19286-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ons 15454Ons 15454 m2Ons 15454 m6

Table of Contents