Cisco ONS 15454 Series Procedure Manual page 170

Dwdm
Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

Required Tools and Equipment (ETSI)
d.
Plug the nine connectors on one end of the EAP cable into the two DCN ports and the seven
subtending shelf controller (SSC) ports of the MS-ISC-100T card located on the left side of the node
controller shelf (Slots 1 to 6). Plug the other end of the EAP cable into the multishelf port on the left
EAP.
e.
Plug the nine connectors on one end of the EAP cable into the two DCN ports and the seven SSC
ports of the MS-ISC-100T card in the right side of the NC shelf (Slots 12 to 17). Plug the other end
of the EAP cable into the multishelf port on the right EAP.
Figure 1-32
Step 2
To connect a subtending shelf to the EAP, complete the following (see
a.
Using a cross-over (CAT-5) LAN cable, plug one connector into the front panel of the subtending
shelf TCC2/TCC2P/TCC3 card in Slot 7 and plug the other end into the SSC1 port on the left EAP.
Cisco ONS 15454 DWDM Procedure Guide, Release 9.2
1-82
Connecting the EAP to the Node Controller and Subtending Shelf
EAP
Subtended Shelf
RJ-45
TCC2/
TCC2P/
TCC3
Slot 7
Node Controller Shelf
DCN1
DCN2
SSC1
SSC2
SSC3
SSC4
SSC5
SSC6
SSC7
NC
RJ-45
PRT
TCC2/
UA
TCC2P/
TCC3
MS-ISC
Slot 7
Slot 6
Chapter 1
Install the Cisco ONS 15454 Shelf Assembly
EAP
RJ-45
TCC2/
TCC2P/
TCC3
Slot 11
DCN1
DCN2
SSC1
SSC2
SSC3
SSC4
SSC5
SSC6
SSC7
RJ-45
NC
PRT
TCC2/
UA
TCC2P
/TCC3
MS-ISC
Slot 11
Slot 12
Figure
1-32):
78-19286-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ons 15454Ons 15454 m2Ons 15454 m6

Table of Contents