Cisco ONS 15454 Series Procedure Manual page 6

Dwdm
Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

Contents
NTP- G270 Open and Remove the Front Door of the ONS 15454 M2 Shelf Assembly
NTP- G267 Install the Power Module in the ONS 15454 M2 Shelf Assembly
NTP- G268 Install the Fan-Tray Assembly in the ONS 15454 M2 Shelf Assembly
NTP- G271 Install the Power and Ground to the ONS 15454 M2 Shelf Assembly
NTP- G291 Attach Wires to Timing, LAN, and Craft Pin Connections in ONS 15454 M2
NTP- G313 Install and Configure the TNC or TSC Card
NTP- G269 Install the Front Door of the ONS 15454 M2 Shelf Assembly
NTP- G275 Perform the ONS 15454 M2 Shelf Installation Acceptance Test
Cisco ONS 15454 DWDM Procedure Guide, Release 9.2
vi
DLP- G582 Mounting the 19-inch Brackets on the ONS 15454 M2 Shelf for ANSI Rack
Configuration
2-10
DLP- G583 Mounting the 23-inch Brackets on the ONS 15454 M2 Shelf for ANSI Rack
Configuration
2-11
DLP- G584 Mounting the Bracket with Air Deflectors (Front-to-Back) on the ONS 15454 M2 Shelf for
ANSI Rack Configuration
DLP- G585 Mounting the Brackets on the ONS 1545 M2 Shelf for ETSI Rack Configuration
DLP- G586 Mounting the Air Deflectors (Front-to-Front) on the ONS 15454 M2 Shelf for ETSI Rack
Configuration
2-16
DLP- G587 Mounting the Bracket with Air Deflectors (Front-to-Back) on the ONS 15454 M2 Shelf for
ETSI Rack Configuration
DLP- G588 Mounting the Bracket with Air Deflectors (Front-to-Top) on the ONS 15454 M2 Shelf for
ETSI Rack Configuration
DLP- G589 Mount the ONS 15454 M2 Shelf Assembly on a Rack (One Person)
DLP- G590 Mount the ONS 15454 M2 Shelf Assembly on the Wall
DLP- G591 Mount the ONS 15454 M2 Shelf Assembly on the Desktop
DLP- G594 Open the Front Door of the ONS 15454 M2 Shelf Assembly
DLP- G595 Remove the Front Door of the ONS 15454 M2 Shelf Assembly
DLP- G592 Install the AC Power Module in the ONS 15454 M2 Shelf Assembly
DLP- G593 Install the DC Power Module in the ONS 15454 M2 Shelf Assembly
DLP- G596 Connect Office Power (AC) to the ONS 15454 M2 Shelf Assembly
DLP- G597 Connect Office Power (DC) to the ONS 15454 M2 Shelf Assembly (ANSI Only)
DLP- G598 Connect Office Power (DC) to the ONS 15454 M2 Shelf Assembly (ETSI Only)
DLP- G599 Turn On and Verify AC Office Power on the ONS 15454 M2 Shelf Assembly
DLP- G600 Turn On and Verify DC Office Power on the ONS 15454 M2 Shelf Assembly
DLP- G292 Install Timing Wires in ONS 15454 M2 - ANSI
DLP- G293 Install Timing Wires in ONS 15454 M2 - ETSI
DLP- G294 Install LAN Wires in ONS 15454 M2
DLP- G604 Install the TNC or TSC Card
DLP- G605 Provision PPM and Port for the TNC Card
DLP- G606 Configure UDC and VoIP for the TNC Card
DLP- G601 Inspect the ONS 15454 M2 Shelf Installation and Connections
2-13
2-18
2-20
2-60
2-60
2-61
2-22
2-23
2-25
2-27
2-28
2-30
2-34
2-37
2-40
2-54
2-56
2-63
2-64
2-65
2-67
2-68
2-15
2-26
2-30
2-32
2-43
2-48
2-51
2-52
2-53
78-19286-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ons 15454Ons 15454 m2Ons 15454 m6

Table of Contents