Cisco ONS 15454 Series Procedure Manual page 158

Dwdm
Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

Required Tools and Equipment (ETSI)
DLP-G352 Install the Y-Cable Module Tray
Purpose
Tools/Equipment
Prerequisite Procedures None
Required/As Needed
Onsite/Remote
Security Level
The Y-cable module tray requires 1 RU in a standard 19-inch (482.6-mm) or 23-inch (584.2-mm) rack.
Step 1
Locate the RMU space specified in your site plan. Refer to the "Shelf Assembly Hardware" chapter in
the Cisco ONS 15454 DWDM Reference Manual for common site configurations, and use the
Cisco TransportPlanner Internal Connections Report to determine how many Y-cable modules you need
to install.
Step 2
Verify that the mounting brackets attached to the unit are correct for your rack size. Complete
Reverse the Mounting Bracket to Fit a 19-inch (482.6-mm) Rack (ANSI Only)" task on page 1-10
required.
Align the chassis with the rack mounting screw holes, insert the four screws, and tighten.
Step 3
Return to your originating procedure (NTP).
Step 4
DLP-G30 Install the FlexLayer Shelf
Purpose
Tools/Equipment
Prerequisite Procedures None
Required/As Needed
Onsite/Remote
Security Level
The FlexLayer shelf requires 1 RU in a standard 19-inch (482.6-mm) or 23-inch (584.2-mm) rack.
Step 1
Locate the RMU space specified in your site plan. Refer to the "Shelf Assembly Hardware" chapter in
the Cisco ONS 15454 DWDM Reference Manual for typical DWDM site layout plans.
Step 2
A set of mounting brackets are included with the FlexLayer mounting kit, one set each for 19-inch
(482.6-mm) or 23-inch (584.2-mm) racks. Verify that your chassis is equipped with the correct set of
brackets for your rack. Change the brackets as required.
Cisco ONS 15454 DWDM Procedure Guide, Release 9.2
1-70
This task installs the Y-cable tray. The Y-cable tray can store up to eight
Y-cable protection units.
#2 Phillips Dynamometric screwdriver
Y-cable module tray(s) (15454-YCBL-LC)
Cisco TransportPlanner Internal Connections Report
As needed
Onsite
None
This task installs the FlexLayer shelf. Perform this task if you are
installing any FlexLayer modules.
#2 Phillips Dynamometric screwdriver
FlexLayer shelf assembly (15216-FL-SA)
#14 AWG wire (minimum) for frame grounding
As needed
Onsite
None
Chapter 1
Install the Cisco ONS 15454 Shelf Assembly
"DLP-G3
as
78-19286-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ons 15454Ons 15454 m2Ons 15454 m6

Table of Contents