Predefined maintenance
method
System CIP
System Preparation
ÄKTA avant User Manual 29035184 AE
Principle
The system is filled with cleaning solution.
Select for example inlets, outlets and col-
umn positions to be cleaned. Three System
CIP phases are included in the method to
facilitate the use of three different cleaning
solution. Additional System CIP phases can
be added from the Phase Library if de-
sired.
The system is filled with preparation solu-
tion. Select for example inlets, outlets and
column positions to be prepared. Two
System Preparation phases are included
in the method. Additional System Prepara-
tion phases can be added from the Phase
Library if desired.
9 Reference information
9.6 Predefined methods and phases
Included phases