GE AKTA avant User Manual page 140

Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

4 Optional instrument modules
4.11 Second UV monitor
Illustration of UV monitor U9-L
The following illustration show a detailed view of the monitor and detector.
Part
1
2
3
4
5
Location of UV monitor U9-L
Depending on the application, the second UV monitor can be placed at different positions
in the flow path, for example close to the first UV monitor or before the Column valve.
Use the nearest empty module position or an Extension box to hold the second UV
monitor U9-L. See Section 2.6.3 Extension box, on page 53.
The second UV monitor can be located anywhere in the flow path and is therefore shown
in the Process Picture in UNICORN as a component without a fixed place. This means
that it is possible to place the second UV monitor U9-L before the first UV monitor in the
flow path.
140
Description
Inlet
UV monitor U9-L
UV flow cell. Two different path lengths are available:
2 mm (default) and 5 mm
Outlet
UV detector
ÄKTA avant User Manual 29035184 AE

Advertisement

Table of Contents
loading

Table of Contents