GE AKTA avant User Manual page 129

Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

Flow
path
1-4
and 2-
3
1-2
and 3-
4
System properties
Follow the instruction to update the system properties.
Step
1
2
3
System settings
If the valve is placed in the flow path between the UV monitor and the outlet valve, the
delay volume must be set. See Check or set delay volumes, on page 153.
ÄKTA avant User Manual 29035184 AE
Description
Two simultaneously used flow channels where the flow is directed between
port 1 and port 4 and between port 2 and port 3.
Two simultaneously used flow channels where the flow is directed between
port 1 and port 2 and between port 3 and port 4.
Action
Open the system properties Edit dialog box.
In the Component types list, click Valves and pumps.
In the Component selection list, select the check boxes corresponding to
the installed modules. Then click OK.
4 Optional instrument modules
4.8 Versatile valve
129

Advertisement

Table of Contents
loading

Table of Contents