GE AKTA avant User Manual page 292

Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

7 Maintenance
7.6 Maintenance when required
7.6.2 Perform System CIP
Step
4
292
Action
In the Phase Properties tab of each of the System CIP phases:
Enter a note for the first solution (optional).
Enter values for Flow rate, Volume per position and Incubation time.
Define the extent of cleaning by selecting the check boxes.
Note:
For complete cleaning of the Injection valve, select at least one of the sample
inlets and clean the manual injection port using a syringe (see Clean the
manual injection port of the injection valve, on page 294).
Note:
The pH electrode is not included in System CIP, but the flow restrictor is in
line. Refer to Section 7.6.7 Clean the pH electrode, on page 307 for instructions
on how to clean the pH electrode.
ÄKTA avant User Manual 29035184 AE

Advertisement

Table of Contents
loading

Table of Contents