GE AKTA avant User Manual page 216

Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

5 Operation
5.8 Fractionation
5.8.2 Prepare Fraction collector F9-R
Step
3
4
5
216
Action
Adjust the height so that the horizontal mark (5) on the tube sensor (6)
is at the same level as the top of the flat collection tubes and approxi-
mately 2 mm over the top of the flanged collection tubes (4).
Lock the delivery arm at this height with the lock knob.
Check that the tube sensor (9) is in the correct position for the tubes used
(10). The eluent tubing (7) should be above the center of the collection tube.
7
8
9
10
Use the sensor control (8) to position the tube holder over the center of the
collection tube.
4
6
5
ÄKTA avant User Manual 29035184 AE

Advertisement

Table of Contents
loading

Table of Contents