Step 3: Measure the resistance of the SV1 coil.
1.
Lift and support the operator's seat.
2.
Remove the 4 fasteners securing the operator's floor panel. See
1. Operator's floor panel fasteners (4)
3.
Remove the operator's floor panel and locate the hydraulic lift manifold. See
1. Hydraulic lift manifold
2. Operator's seat
4.
Locate the SV1 solenoid on the lift manifold. See
Figure
Figure 105
2. Operator's floor panel
Figure 106
3. 48V disconnect
Figure
107.
187
105.
Figure
106.
g035763
g035723