Toro Reelmaster 5010-H Diagnostic Manual page 142

Hide thumbs Also See for Reelmaster 5010-H:
Table of Contents

Advertisement

3.
Rotate the ignition key to the O
4.
Measure the voltage between pins 1 and 2 of connector P49. The reading should be 48 Vdc.
5.
Measure the voltage between P48 pin 1 and P49 pin 2. The reading should be 48 Vdc.
6.
Rotate the ignition key to the O
Pass
The voltage readings were good. Go to Step 7.
Fail
The voltage readings were not good. Go to Step 6.
Step 6: Test the power and ground wiring in main harness connectors
P48 and P49.
These are diagnostic steps to help isolate problems identified in Step 5. Use a multimeter to test the resistance
between the following pairs of locations:
Location
Harness
1
Main
2
Main
1
Main
2
Main
1
Main
2
Main
Pass
The resistance tests passed, but the voltage readings in Step 5 are still bad.
Note:
Do not go to Step 7 until after the voltage readings in Step 5 are good.
Fail
One or more of the power and ground wiring tests failed. Repair or replace the worn or damaged
parts. Go to
position.
N
position.
FF
Pin
Connector
P49
1
P37
3
P49
2
P37
4
P48
1
P49
2
Returning the Machine to Service (page 22)
Wire
Expected
Color
Reading
Red
Less than
2 ohms
Red
Black
(48V
Ground)
Less than
2 ohms
Black
(48V
Ground)
White
24k to 26k
ohms
Black
(48V
Ground)
and follow the steps listed.
142
Connector Graphic

Advertisement

Table of Contents
loading

This manual is also suitable for:

03674

Table of Contents