FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
8
Installing Devices Inside the Pre-fab.
Table 8-1 Device installation list
Device
Li-Battery
Cabinet
(Optional)
Electric
heating belt
(Optional)
ECC800-Pro
PAD
(Optional)
Fire cylinder
External
horn strobe
8.1 Installing Power Supply and Distribution Devices
Issue 01 (2021-04-20)
Componen
Installation Position
t to Be
Installed
Battery
N+X scenario: Li-Battery Cabinet-1
module
2N scenario: Rectifier-1
\
Water refill and drainage pipes
outside the pre-fab. module
MicroSD
ECC800-Pro main control module
card
SIM card
ECC800-Pro main control module
4G antenna
Top of the pre-fab. module feeder
window
RF_Z
Attached to the top of the
antenna
monitoring box
\
Beside the main entrance door
inside the pre-fab. module
\
Inside the pre-fab. module
\
Beside the main entrance door
outside the pre-fab. module
Copyright © Huawei Technologies Co., Ltd.
8 Installing Devices Inside the Pre-fab. Module
Module
Quantity
8 PCS
8 PCS
2 PCS
1 PCS
1 PCS
1 PCS
1 PCS
1 PCS
1 PCS
1 PCS
68