● After cables are routed into feeder windows on the ends of pre-fab. modules,
use Styrofoam to seal the hole inside the pre-fab. modules.
● The armored cables must be grounded.
External cables must be routed from bottom to top and have backwater bend.
Figure A-4 Backwater bend
A.1.6.1 Installing DPJ End Connectors
Prerequisites
Except armored power cables among FusionDC1000 external cables, the other cables must be
routed through a feeder window using DPJ end connectors.
Context
A DPJ end connector consists of a body, ferrule, guarding, and cover lock nut.
Issue 01 (2021-04-20)
NO TICE
Do not operate a feeder window outdoors under bad weather conditions if no
shelter is available.
Cables have been mounted on cable trays.
Cables need to be routed into a feeder window using DPJ end connectors.
NO TE