FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
Step 5 Install battery communications cables.
1.
2.
Figure 8-4 Installing battery communications cables
Step 6 Install battery copper bars and cables.
1.
2.
3.
● When installing a copper bar, connect the part with a round hole to the upper
battery module, and connect the part with a slotted hole to the lower battery
module. Install the part with a round hole first, and then the part with a slotted
hole.
● Excessive bolts will be used as spare parts.
Issue 01 (2021-04-20)
Install communications cables between battery modules.
Connect communications cables (reserved in the cabinet) between the battery
modules and the battery management module.
Open the terminal protective covers, install copper bars between battery
modules, and close the terminal protective covers.
Open the terminal protective covers, install copper bars between battery
modules and fuses, and close the terminal protective covers.
Open the terminal protective covers, install the battery cables reserved in the
cabinet, and close the terminal protective covers.
NO TICE
Copyright © Huawei Technologies Co., Ltd.
8 Installing Devices Inside the Pre-fab. Module
71

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r021c00

Table of Contents